Land Development Engineering in Houston & Harris County
We prepare development plans that are ready for review by the county, city or utility district, with lot layout, access, water, wastewater and drainage designed as a coordinated whole.
- 50+ years of engineering experience
- Family-owned in Channelview, TX
- Licensed installers and engineers in Texas
- 9 communities served, including Channelview, Baytown & Crosby
Who it's for
- Landowners evaluating how a tract can be used before buying, selling or building
- Builders planning a small subdivision or a group of homes
- Commercial and industrial owners developing a site in Harris County or a nearby city
- Churches, schools and businesses expanding onto adjacent property
What's included
- Site planning: lot layout, building placement, setbacks and access
- Water and wastewater planning, including on-site systems where sewer service is not available (see water & wastewater)
- Drainage and detention design (see drainage improvements)
- Platting through the city, county or MUD (see platting)
- Permit submittals and responses to reviewer comments
How it works
-
Site review
Provide the address or parcel, your intended use and any existing survey. We review access, utilities, floodplain status and the regulations that apply.
-
Feasibility
We advise you on what the property can accommodate, which approvals are required and the cost of the engineering work.
-
Design
We prepare the site, utility and drainage plans, sealed by a licensed professional engineer.
-
Approvals
We submit the plans to the reviewing agencies and respond to comments through final approval.
Questions about land development
What is the difference between land development and platting?
Platting is one step in the process. It legally establishes lots, easements and building lines. Land development encompasses the complete plan for the property, including layout, utilities, drainage and approvals. Most projects require both, and we provide both.
Do I need a survey before starting?
In most cases, yes. A boundary survey, and often a topographic survey, is the starting point for design. If you do not have one, we will advise you on the type of survey required.
How long does the approval process take?
It depends on the agency and the scope of the project. A single commercial site can move relatively quickly, while a subdivision requiring a plat, utilities and detention takes longer. We provide a realistic timeline after the site review.
What does land development engineering cost?
Fees depend on the size of the tract and the number of approvals required. After a brief site review, we provide a written proposal.